University North Roofing Services

What is the best option of roofing material to use? Is it asphalt shingle or metal roof? House owners, engineers, contractors and designers all have a different point of views in selecting the right roofing system for homes in University North.

Because of this a roofer can be difficult to find. Nevertheless, our roofing expert will assist the property owner regardless of any program. Each of these individuals will have a various agenda and reasoning for choosing particular products.

how much does it set you back for roofing

Roofing Contractors - Understanding What a Roofing Contractor Does and Tips on Selecting One

Asphalt shingles are proven, commonly utilized and accepted as a great option. House buyers feel safe using shingles as roofing materials from their contractors. The most significant selling point of asphalt shingles (aside from its reputation) is the price.

They have a low cost and high-end choices. Entry level or production real estate can utilize the basic three tab shingle. Although, individuals with a bigger budget plan can ask our their contractor about designer shingles.

What To Look For When Considering Roof Repair And Restoration

Most roofing experts use asphalt shingles due to the fact that they are the common choice and have been broad used for a very long time. Nevertheless, metal roofs are ending up being more extensively utilized also throughout the area.

There’s a lot of design choices which varies from elegant to fundamental. Shingles normally include a 20-30 year guarantee, and a great deal of them are fire-rated also.

Considering that metal roofs are not as commonly utilized here yet, they can appear severe. In the minds of many people, metal is utilized for barns and warehouses.

why roof upkeep is very important

They are easy to repair and deal with. Other types of roofs can be managed by our roofers.

Roof Repairs For an Emergency

Metal roofs use to have problems with corrosion. Now, our University North contractors can describe that current ones are made with specialized resin paints which can endure salt spray, extreme heat, and heavy rainfall that we typically see in the area.

When looking to make your roof more resistant to the elements, installing tile roofing may be your best bet. This allows the roof to drain away from the home and preventing potential water damage. Tile and other materials such as shingle roofing can be installed to achieve damage prevention. This can be done yourself, although it requires a fair amount of knowledge to attempt. The following information gives you a thorough look at different parts of the roofing structure and the materials and strategies that protect it, as well as approaches to install roof materials. Pieces of tile roof are installed individually, while battens align them correct along the roof. Begin the process of roof installation by starting at the eave risers and working upwards on the roof. Be sure not to overdrive the nails, for this increases the risk of cracking the tile. Put in gable end titles where the gable ceases, layer them shingle-style up the roof. Every gable end title should cover the nails fastening the previous gable tile. Install ridge tiles on the appropriate ridges. Make sure that the ridge tiles also cover the nails used to cover previous ridge tiles. The work it takes to install tiles may be daunting, but it's worth it in protecting your home.


Shingle roof is installed in sheets; tabs are cut out along the bottom of each sheet. These tabs are what's exposed to the weather and provide shingles their distinctive patterns. Install the starter course of shingles at the eaves. Make sure to cut them lengthwise so that the adhesive is at the edge of the roof. Also note that the starter course goes over the outer edge of the drip edge no more than half an inch. The first row of shingles also shouldn't extend more than half an inch over the same perimeter. The shingles should be layered from the eaves towards the ridge, nailed accordingly with the manufacturer's instructions (four nails per shingle are standard). Finish by installing the ridge shingles, working them from the ridge towards the center. The labor it takes to install shingles may seem a bit much, but serves as a way to both stylize and protect your home. There are other methods to prevent roofing damage beyond tile and shingles. Drip edges, for example, protect roofing by allowing water to drain away from the home. Exposing the home to water is a gateway to disaster, whether it be leaks or mold growth. Roofing can further be protected from the elements by roofing underlayment. The water that penetrates the exterior roofing will be washed away by the underlayment. Self-sticking underlayment are useful in cold climates where ice may melt and attempt to move within the roof. These principles are simple yet crucial in the process of protecting one's home from the elements.

Utilizing metal roofing for your home means helping nature too. Did you know that steel is 100% recyclable? You won’t see any metal roofs thrown away in a landfill. Professionals can explain how they assist you conserve more energy too.

There are a lot of choices of metal roof, and roofing contractor who will you know what and who to pick? Our experts will assist you in selecting which is appropriate for your home. Your choices variety from traditional metal roofing to high-end roof materials. Shingles are inexpensive, however overall the advantages fall short when compared with metal roof.

Roof valleys are a frequent source of leaks in older houses. Installation procedures differ depending on the roof type and materials used. We will look here at the basic installation of an open lead lined roof valley. A roof valley is basically a gutter set between two meeting pitched roofs. Depending on the roof area it serves, the valley is the exit point for a large volume of water so extreme care should be taken with installation. If the roof has been leaking for a while or if there are any signs of rot, you will need to start by replacing the valley boards. Lead sheet is not self supporting and should be placed on treated roofing boards of sufficient strength to hold a large person. Fit boards of sufficient width to accommodate the lead plus 100mm either side. This will give you something to nail the roofing batons to.The top of the valley boards should be at the same level as the top of the roof rafters.


If you lay the boards directly on top of the rafters it may cause the roofing tiles to kick up and restrict water run off. You will need to cut the valley boards to fit in between the rafters. Support the valley boards with studs or noggins. The valley should finish on an even plane at the eaves. It should not kick up higher than the bottom rafters. If it does, you will need to cut the fascia board or adjust the gutter to suit. It is a good idea to fit a tilting fillet each side of the valley. This angled strip of wood runs along the valley length and should be a minimum of 150mm from the center of the valley. It should sit no higher than the roofing batons with the thinnest end closest to the center of the valley.It is common practice to fit a single sheet of roofing underlay the entire length of the valley. The adjacent roofing underlay will rest on top of this sheet. I recommend you use one of the new advanced synthetic underlay materials. The older bitumen based felts are fine for normal roofing situations but are not suitable for valleys. Over time the bitumen will bond the lead to the boards and restrict thermal movement.


You should ensure you buy lead of a sufficient grade/code for valley applications. This should be between 1.80mm and 2.24mm thickness. If you are unsure ask your roofing merchant of the correct grade. The lead should be cut into sections no larger than 1.5 meters in length to allow sufficient thermal movement. Bend a welt into the lead 25mm each side. This acts as a last line of defence for water penetration. It also has the added benefit of stiffening the lead, which makes carrying it up the roof a lot easier.Starting at the bottom of the valley, dress the lead neatly onto the valley boards and over the tilting fillets. The bottom of the lead should allow correct drainage into the gutter. Fix two rows of nails at the very top of the flashing. Use copper or stainless steel nails. Never use galvanised or aluminum nails which will just react with the lead and corrode.


I recommend you use the minimum amount of fixing possible to hold the lead in place. If you over fix lead sheeting it will eventually split due to thermal movement. So don't nail the sides. When you have successfully dressed the first sheet you can move up the roof laying subsequent sheets. Overlap each sheet a minimum of 150mm. On lower pitched roof valleys you will need to increase the lap. Where the valley ends at the ridge, you will need to dress the lead so it can sit neatly under the ridge tiles. You are now ready to start fixing the batons and laying the roofing tiles. The key points to remember are to keep the sheet lengths down to 1.5 meters and don't over fix. If you follow the procedure outlined and take care with the dressing you will produce a durable maintenance free valley.

Roofing Company, Roof Contractor, Roof Replacement, Roofer, Roof Installation, Roofing Contractors, Roofing Services, Residential Roofing, Roofers, Roofing Contractor, Roofing